动漫av无码不卡的网站,成人免费无码大片a毛片抽搐网站

會(huì)員登錄|免費(fèi)注冊(cè)|忘記密碼|管理入口 返回主站||保存桌面|手機(jī)瀏覽|聯(lián)系方式|購(gòu)物車
企業(yè)會(huì)員第1年

江蘇宏亞高空工程有限公司  
加關(guān)注0

通信終端設(shè)備

搜索
聯(lián)系方式


請(qǐng)先 登錄注冊(cè) 后查看


新聞分類
  • 暫無(wú)分類
站內(nèi)搜索
 
榮譽(yù)資質(zhì)
  • 暫未上傳
首頁(yè) > 公司新聞 > 美化冷卻塔煙筒工程
公司新聞
美化冷卻塔煙筒工程
2023-07-13IP屬地 湖北21

  Three doors and windows chimney painting

  (A) operation process to beautify the cooling tower chimney project

  Door frame installation

  During installation, it should be placed according to the horizontal elevation and plane position required by the design drawings, according to its opening direction and corresponding codes, with a small plumb hammer for horizontal and vertical correction, and then connected firmly with adjacent fixtures with braces.

  Before the wall is built, the frame should be installed, and wooden bricks should be reserved in the frame to beautify the cooling tower chimney project according to the design requirements.

  When leaving a hole due to conditions and other reasons

  A wood brick shall be embedded in the masonry, and there shall be no less than three fixed points on each side, and the spacing between them shall not be greater than. ∽. m. One side of the wall with a wooden wedge is attached to the masonry, and the door frame is temporarily fixed in the doorway with a wooden wedge, and then nailed with a nail or a steel nail. Beautify cooling tower chimney project

  B When there are no wooden bricks left in the masonry, fix the side of the door frame against the wall with a straight iron with a width of mm, a length of mm, and a thickness of ∽mm, and attach it to the wall. After temporarily fixing the door frame in the doorway with a wooden wedge, nail it with a nail gun or steel nail.

  c安裝時(shí)應(yīng)考慮抹灰層的厚度,豎框應(yīng)與抹灰皮平齊。

  第八章給排水煙囪涂裝方法美化冷卻塔煙囪工程

  1.冷卻塔煙囪工程美化總體布置及要求

  該安裝煙囪油漆質(zhì)量標(biāo)準(zhǔn)優(yōu)良。

  工期與土建煙囪粉刷緊密配合,煙囪粉刷安裝進(jìn)度隨土建總體計(jì)劃和進(jìn)度的變化而調(diào)整,確保煙囪粉刷安裝的順利進(jìn)行和任務(wù)的圓滿完成。美化冷卻塔煙囪工程

  根據(jù)本次煙囪粉刷的特點(diǎn),擬定煙囪粉刷方案的原則是先安裝地下部分,再安裝地上部分,先主管后支管。管道安裝應(yīng)遵循以下原則:小管換大管,支管換主管;有壓力管做無(wú)壓力管;一般來(lái)說(shuō),管道是隔熱的。樓層內(nèi)所有管道應(yīng)在土建主體的煙囪粉刷后安裝,室外安裝的煙囪粉刷。

  2.主煙囪油漆的順序和內(nèi)容

  協(xié)調(diào)階段的冷卻塔煙囪美化工程

  看圖紙→提出問(wèn)題→解決問(wèn)題→粉刷主煙囪,注意預(yù)留洞槽、預(yù)埋件、墻內(nèi)、樓板內(nèi)管道安裝、洞槽清理。

  安裝階段

  生活給水、消防給水、生活污水雨水排水管道安裝→試壓、隱蔽驗(yàn)收、充水閉水試驗(yàn)→衛(wèi)生潔具安裝設(shè)備試運(yùn)行。

  驗(yàn)收階段

  水試驗(yàn)中沖洗和消毒的竣工驗(yàn)收

  三煙囪涂裝技術(shù)要求

  生活供水管

  生活給水管采用國(guó)標(biāo)熱鍍鋅鋼管,材料按規(guī)定檢驗(yàn)合格后方可使用。

  If the diameter of galvanized steel pipe is less than DN, threaded connection shall be adopted; if the pipe is installed, the exposed hemp filler shall be cleaned, and the internal dirt and sundries must be removed; the exposed parts where the installation is interrupted or completed shall be temporarily closed, and the threads of the pipe shall be regular; if there is broken or missing wires, it shall not be more than% of the total thread deduction; if the pipe diameter is greater than DN, flange connection shall be adopted, and the welding joint shall be internally and externally protected. The main pipe and the inlet pipe buried in the floor shall be painted by welding chimneys, and shall be embedded with civil works. The upper concrete can only be poured after passing the pressure test, and the test pressure shall not be less than. MPa. The internal and external anticorrosion treatment of this pipeline shall be done according to the design requirements.

  安裝給水立管時(shí),應(yīng)先根據(jù)圖紙找好平面尺寸位置,

  管道水平安裝時(shí),先檢查管道平面位置的管道中心標(biāo)高,根據(jù)驗(yàn)收規(guī)范確認(rèn)支架的正確定位,制作并埋設(shè)支撐支架??偟囊笫潜WC垂直牢固,與管道緊密接觸。支架擬采用角鋼工,其中管徑< DN采用X角鋼,管徑> DN采用X角鋼,管徑< DN時(shí)吊桿采用φ元鋼,管徑> DN時(shí)采用φ鋼筋。美化冷卻塔煙囪工程

  支吊架擬采用φ膨脹螺栓固定在建筑結(jié)構(gòu)墻板上,不影響結(jié)構(gòu)安全。泵房?jī)?nèi)管道的支吊架擬采用φ膨脹螺栓固定。

  管道安裝后,必須對(duì)管道進(jìn)行校正和拉直,以確保管道水平和垂直安裝在支架上,并牢固固定。管道安裝后,請(qǐng)監(jiān)理煙囪油漆工和質(zhì)檢站檢查合格后,再做水壓試驗(yàn),并填寫水壓試驗(yàn)記錄。隱蔽管道完成后,及時(shí)填寫隱蔽記錄,經(jīng)甲方等質(zhì)監(jiān)部門檢查合格后,做好簽證工作,再進(jìn)入下道工序。

  排水管道

  根據(jù)設(shè)計(jì)要求,排水管道和通風(fēng)管道的立管和橫管采用國(guó)標(biāo)加厚承插鑄鐵管。石棉水泥沖孔。鉆孔前需用油麻填充,深度不得超過(guò)承口深度。壓力排水管采用焊接鋼管;雨水管采用PVC塑料管,連接口采用膠水連接;空調(diào)排水采用鍍鋅鋼管,立管采用首層PVC塑料排水管接雨水管。美化冷卻塔煙囪工程

  安裝位置、數(shù)量等。塑料排水管道上的檢查口、清掃口、雨水斗膨脹膨脹節(jié)應(yīng)符合設(shè)計(jì)和煙囪涂裝工藝及規(guī)范要求。排水立管的檢查口應(yīng)安裝在距地面m處,檢查口的朝向應(yīng)便于維修;隱藏式立管應(yīng)在檢查口配備一個(gè)檢修門。二層所有排水管道均設(shè)有清掃口。雨水管與雨水斗的連接是封閉的,不允許有敞開(kāi)的水桶。

  管道固定支架之間的距離,水平管道φ→。m φ→。m φ→。m,垂直管道不大于m,高度小于或等于m時(shí),應(yīng)設(shè)置固定件。當(dāng)高度大于m時(shí),應(yīng)設(shè)置固定件,固定件應(yīng)盡可能靠近立管的下邊緣。管道支架結(jié)構(gòu)合理,埋設(shè)平整牢固,排列整齊,支架與管道緊密接觸,排水橫管敷設(shè)在梁底。安裝排水塑料管。當(dāng)層高≤m時(shí),每層應(yīng)設(shè)一個(gè)伸縮縫;層高為m時(shí),應(yīng)根據(jù)擴(kuò)展量確定。美化冷卻塔煙囪工程

©2025 江蘇宏亞高空工程有限公司 版權(quán)所有   技術(shù)支持:跨度網(wǎng)   訪問(wèn)量:14985